The ship was preserved and is displayed in the wonderful Viking Ship Museum at Oslo.
On June17th 2010 a new era in the exciting history of this ship began with a project to build an exact replica using the same tools and techniques as were used to build the original. As soon as I heard about the project I knew I had to visit and hopefully work on the ship. An internet friend Tim Allen had been volunteering on the worksite and put me in contact with the New Oseberg Ship Foundation arrangements were made and last week I spent 4 days working on this most remarkable of building sites. My camera cards are bursting with pictures so I’ll do a few posts starting with the raw material.
The ship is built entirely of cleft and hewn oak, no saws were used. The trees by modern standards were impressive fat tall and straight grained, a foresters or saw-millers dream. Here are a couple of typical trees for the project with the part built ship in the background. Trees of this quality have proved impossible to source in Norway so most of the planking trees have come from Denmark. The oak for the keel, the backbone of the ship was however felled locally.
The trees are split with hammers and wedges, first in half then quarters, eighths and finally sixteenths, the last is the hardest split to get to run true. Whenever you split wood if you get exactly even amounts of wood either side of your slit it is more likely to run true and straight, get it wrong and the split will “run out” leaving you with one heavy thick chunk and one too thin to use. The important thing is to get as wide a plank as possible by avoiding the split running out as it heads toward the thin centre. To do this the shipwrights start by cleaning a 2″ wide flat at the centre of the tree scoring a centre line down this with a chisel and then inserting small wooden wedges. Only then do they start opening up the split with metal wedges knocked in from the end, this is Gregorius.
And once they are happy they let visitors who’s skill level they are not yet sure about have a go :0)
This split started to run off on the underside so we started again from the far end, this time it ran true. It was worth taking the time as the original tree was nearly £1000 and would yield just 16 of the widest planks.
once the split is going well you can use a bit more force, Tim with the big mell.
The thick wedge this produces is then hewn down to a single plank with a axe, planed, steamed, fitted and finally riveted into place with iron boat nails. More on that in the following posts. I’ll also post about the organisation and running of the project and the gorgeous replica axes and other tools. Cleaving timber for ships like this died out, Thomas told me, in the 1200s, we can clearly see that the timbers of earlier ships were cleft and later they were sawn but the art of cleaving wide long boards for shipbuilding was completely lost for 800 years. Thomas and the team from Roskilde developed their way of working but no-one really knows exactly how the Vikings did it.
Next stages are
hewing the planks part 2
steaming and fitting part 3
riveting or klinking Part 4
carving, worksite organisation and funding Part 5
Quite amazing. My dad built a wooden scale kit model of one of these when I was a kid
Having been raised around a sawmill, I find this fscinating!
Fascinating! I look forward to seeing the rest soon. Thanks!
glad you are liking it, few more posts done now and a couple more to follow.
Very interesting, as my daughter-in-law is norge,I may be able to tell her something she doesn’t know.
The links to parts 2 through 5 seem to me to be broken.
I’d love to follow.
Norm